Many extensions and modifications have been made to standard process monitoring methods such as the exponentially weighted moving average (EWMA) chart and the cumulative sum (CUSUM) chart. In addition, new schemes have been proposed based on alternative weighting of past data, usually to put greater emphasis on past data and less weight on current and recent data. In other cases, the output of one process monitoring method, such as the EWMA statistic, is used as the input to another method, such as the CUSUM chart. Often the recursive formula for a control chart statistic is itself used recursively to form a new control chart statistic. We find the use of these ad hoc methods to be unjustified. Statistical performance comparisons justifying the use of these methods have been either flawed by focusing only on zero-state run length metrics or by making comparisons to an unnecessarily weak competitor.
翻译:对标准流程监测方法,如指数加权移动平均值(EWMA)图表和累积总和(CUUM)图表等标准流程监测方法进行了许多扩展和修改;此外,还根据以往数据的替代加权方法提出了新的计划,通常是为了更加强调过去的数据,而较少强调当前和最新数据;在另一些情况下,一种流程监测方法(如EWMA统计数据)的输出被用作CUUUM图表等另一种方法的投入;控制图表统计数据的递转公式常常被反复使用,以形成新的控制图表统计;我们认为,使用这些临时方法是不合理的;使用这些方法的统计性业绩比较要么仅仅侧重于零状态运行长度的公标,要么与不必要薄弱的竞争力进行对比,从而有缺陷。