A method is presented to combine publicly available electrical generation and interconnector data to create a timeseries dataset that approximates Great Britains half-hourly electrical demand for its public distribution system. The method uses Elexon data for generation plants connected at the transmission level that are monitored as part of the electrical systems national balancing mechanism and combines these with estimates for embedded/distributed solar and wind generation from the system operator National Grid. The resulting timeseries data therefore has both transmission connected and embedded/distribution connected generation, which overcomes one of the limitations of solely using the Elexon data. The data are presented in a raw as well as a visually checked and cleaned form and have been parsed to provide both coordinated universal time (UTC) and localtime values in ISO 8601 compatible format, making the data significantly more interoperable with other data, and more useable by a wider group of researchers and stakeholders. The method has been developed and adapted over several years as the categories of the underlying raw data have been changed from the data providers. Publishing the method and the raw and cleaned data provides other researchers with a method and data that can be further enhanced or adapted and allows the method itself to be considered and critiqued.
翻译:这种方法使用Elexon数据,用于作为电力系统国家平衡机制的一部分监测的在传输一级相连接的发电厂的生成数据,这些数据与系统操作员National Grate的嵌入/分布太阳能和风力生成估计数相结合,因此,由此产生的时间序列数据既具有传输、连接/分配太阳能和风力生成的估计数,也因此克服了仅使用Elexon数据的局限性之一。数据以原始和视觉检查及清洁的形式提供,并进行了分解,以提供协调的通用时间(UTC)和ISO 8601兼容格式的本地时间值,使数据与其他数据更能相互操作,并使更广泛的研究人员和利益攸关方更能使用这些数据。该方法经过多年的开发和调整,基本原始数据类别已从数据提供者处改变。公布该方法,原始和清洁数据为其他研究人员提供了一种方法和数据,可以进一步加强或修改,使该方法本身能够被考虑。