This paper presents a case study analyzing Hibernate ecosystem software projects to investigate and demonstrate Code Debt behavior in relation to severity and rework time. The case study carried out revealed that the Code Debt with severity related to impact on software maintenance is the most representative and has the largest rework times to be paid in the Hibernate ecosystem. Besides, it was found that the distributions of rework times of Code Debt for all severities undergo variations in the initial versions of the development.
翻译:本文介绍了一项案例研究,分析休眠生态系统软件项目,以调查并显示债务法在严重程度和重新工作时间方面的行为,所作的案例研究表明,债务法中与软件维护影响相关的严重性最具有代表性,在休眠生态系统中需支付的最大重工时间,此外,还发现,所有不同区域重整债务时间的分配在最初的开发版本中各不相同。